DINIS / ABOUT US / MANUFACTURING

Take The Route Behind The Ride.

Follow a guided walk through the DINIS amusement equipment workshop: from materials and fabrication to assembly, finishing and dispatch preparation.

A guided workshop visit

See the production flow, one stop at a time.

The route in the DINIS workshop guide begins and ends at Gate 2. Visitors remain on the main aisle while a host explains the areas on either side. The guide describes a walk of approximately half an hour; the actual route and access depend on workshop conditions.

DINIS is the amusement-ride business within YOTO Group. The tour focuses on the DINIS amusement equipment workshop, not every YOTO Group facility.

This page describes a guided visit, not a self-guided site map. Specific workstations may be viewed from the aisle only.
Equipment workshop photograph already published on the DINIS manufacturing page
DINIS workshop image from the existing Manufacturing & Factory page.
The route

From Gate 2 and back.

The following sequence is based on the supplied workshop route diagram and guided-tour script. It summarizes what a visitor can ask about at each stop; it is not a claim that every process is in operation on the visit date.

  1. Gate 2
  2. Materials lab
  3. Cutting
  4. Machining
  5. Fit-up
  6. Welding
  7. Assembly
  8. Finishing
  9. Train & bumper cars
  10. Finished equipment
  11. Technical & QC
  12. Storage
  13. Gate 2
01

Materials & testing laboratory

Start with the materials and weld-inspection area. Discuss incoming-material checks and how inspection information is reviewed for the relevant project.

02

Cutting & preparation

See the area identified for laser cutting of tubes and plates. Ask how prepared components are identified for later fabrication.

03

Machining & bending

View the workshop's machining and bending stations and discuss how formed parts and component dimensions are checked against drawings.

04

Fit-up & alignment

Learn how larger frames are positioned and checked before welding, including alignment, symmetry and connection points.

05

Welding

Observe from the designated safe aisle and ask about fabrication, weld checks and preparation for the next operation.

06

Equipment assembly

Follow the transition from individual components to assembled equipment. Discuss fit, movement and the checks planned for a selected model.

07

Surface preparation & finishing

The route passes blasting and coating areas. Ask how the specified surface finish and color are prepared for the project.

08

Train & bumper-car assembly

View the assembly areas for park trains and bumper cars. Any outdoor test viewing requires separate site arrangements.

09

Finished-equipment area

See where completed or prepared equipment is held before dispatch, and ask how items are identified and packed for an order.

10

Technical & quality teams

The route passes workshop-side technical and quality areas. Discuss how drawings, production questions and inspection information connect.

11

Storage & parts

Finish at the storage area, where materials and parts are organized for production. Ask about the spare-parts scope for your selected equipment.

12

Return to Gate 2

Complete the loop with your host and discuss questions about the equipment, available records and next project steps.

Workshop views

Inside the working environment.

These photographs are already used on DINIS's existing factory page. They illustrate workshop areas, not a guarantee that a particular product, process or station will be available to view on the day of a visit.

YOTO Group manufacturing site image from the DINIS YOTO Group page
YOTO Group manufacturing image from the existing group page; DINIS is its amusement-ride business.
DINIS within YOTO Group

A specialist amusement-ride team within the group.

YOTO Group is the group's headquarters organization; DINIS is its amusement-ride division and workshop operation. The guided route above concerns the DINIS amusement equipment workshop. Group-level imagery is labeled separately so it is not mistaken for evidence of a particular DINIS production step.

Learn about YOTO Group
Plan your visit

Arrive with your project questions.

Contact the team ahead of time to confirm availability, the host, the current workshop route and whether any model-specific production or test records can be discussed.

Before the visit

Share your organization, project location, ride interests and preferred visit dates. Confirm which workshop areas can be viewed.

On the route

Stay with the host on the main aisle. Follow site instructions for helmets and any active overhead lifting, vehicles or equipment.

After the route

Request the approved technical sheets, inspection scope and project-specific follow-up relevant to the equipment you are considering.

Approximate duration in the internal guide: 30 minutes. Actual access and timing are subject to the host's safety assessment and operating conditions. This page is not a site safety plan or an invitation to enter work areas independently.

DINIS / FACTORY VISIT

Discuss a guided workshop visit.

Tell us what you would like to learn about and when you hope to visit. The team can confirm the route and appropriate contact for your project.

Добавьте нас в WeChat

Откройте WeChat и отсканируйте этот QR-код, чтобы добавить контакт DINIS.

Отсканируйте этот QR-код в WeChat, чтобы добавить контакт DINIS.

На телефоне сохраните QR-изображение и отсканируйте его из альбома WeChat.

Сохранить QR-код