Venue setting for Roller Coaster
DINIS / PRODUCT SERIES

Roller Coaster

Track-Based Thrill And Family Rides

Select a track profile around audience, site geometry, operating plan and engineering review.

Get a recommendation ↗
Models10 catalog options
SelectionAudience & site fit
EngineeringModel-specific review
DeliveryDesign to handover
02

Product Family Grid

Compare models for your project, then review the exact configuration.

03

Quick Selection Guide

Project type

Park, scenic destination, resort or commercial venue

Site conditions

Available land, access, foundations and clearances

Guest capacity

Audience mix, boarding and operating plan

Budget range

Equipment plus civil works and installation

Recommended model

An engineer-reviewed shortlist

Ask an engineer →
04

Model Comparison

ParameterLoop Roller CoasterFamily Roller CoasterWacky Worm Roller CoasterCrazy Mouse Roller CoasterDragon Wagon Roller Coaster
Capacity12–24 passengers per train16 passengers18 passengers10 passengers18 passengers
CarsSee configuration table8959
FootprintSee configuration table35 × 25 m25 × 17 m27 × 36 m16 × 24 m
Track Length150–730 m290 m120 m280 m120 m
Operating Height24–45.5 m12 m2.5 m8 m2.3 m
Equipment Height20–54 m14 m3.5 m9.5 m3.3 m
Maximum Speed60–89 km/h35 km/h15 km/h40 km/h15 km/h
Power80–290 kW30 kW6 kW8 kW5 kW
Power Supply380 V380 V380 V380 V380 V
Frequency50 Hz50 Hz60 Hz50 Hz60 Hz
05

Application Scenarios

Start with the venue and visitor experience.

06

Related Rides & Solutions

Plan complementary experiences around the centerpiece.

Explore all solutions
09

Category FAQ

How do I choose the model?

Start with the audience, plot, utilities and ride role. Compare technical values, then review the configuration with an engineer.

Can the appearance and lighting be customized?

Theme, colors and lighting can be discussed for the model. Structural or electrical changes need engineering review.

How are installation and training planned?

Review foundations, lifting access, site readiness, installation responsibilities, commissioning and operator instruction for the order.

What affects the project budget?

Include equipment, foundations, utilities, freight, installation and local acceptance requirements. Financial returns depend on your operating assumptions.

10

Tell Us About Your Project

TALK TO AN ENGINEER

Find The Right Roller Coaster Model

Tell us your requirements and how to reach you. We include this page's topic with your message.

Step 1 of 2 · Contact & Requirements

Fields marked with * are required.

We use your details to handle your inquiry. Read our Privacy Policy for collection, storage and your choices. An inquiry does not subscribe you to marketing.

Your inquiry is submitted in step 1. Step 2 lets you send additional details.

Add Us On WeChat

Open WeChat and scan this QR code to add the DINIS contact.

Scan this QR code in WeChat to add the DINIS contact

On a phone, save the QR image and scan it from your WeChat album.

Save QR code