Venue setting for High Altitude Rides
DINIS / PRODUCT SERIES

High Altitude Rides

Vertical Attractions

Flying towers, swing rides and drop towers for projects with suitable clearances and site conditions.

Get a recommendation ↗
Models7 catalog options
SelectionAudience & site fit
EngineeringModel-specific review
DeliveryDesign to handover
02

Product Family Grid

Compare models for your project, then review the exact configuration.

03

Quick Selection Guide

Project type

Park, scenic destination, resort or commercial venue

Site conditions

Available land, access, foundations and clearances

Guest capacity

Audience mix, boarding and operating plan

Budget range

Equipment plus civil works and installation

Recommended model

An engineer-reviewed shortlist

Ask an engineer →
04

Model Comparison

Parameter46m Fly Tower56m Fly Tower65m Fly Tower15m Portable Drop Tower25m Rotation Tower35m Rotation TowerSeat Luxury Flying Chair
Equipment Height46 m56 m65 m16.9 m25 m (excluding lightning rod)32.4 m7 m
Operating Height29.1 m49 m52 m12.5 m19.5 m28.5 m—
FootprintΦ30 mΦ35 m980 m²8 m × 8 m9 m × 9 m11 m × 8 m—
Capacity36 persons36 persons36 persons12 passengers16 persons16 persons24 seats
Operating Speed13.4 m/s13.5 m/s11.6 m/s6.2 m/s6.1 m/s6.1 m/s—
Lift Speed0.6 m/s0.5 m/s0.5 m/s1.4 m/s1.2 m/s1.2 m/s—
Rotation Speed10.3 rpm10 rpm9.8 rpm————
Drop Speed———6.2 m/s6.1 m/s≤4 m/s—
Rotating Diameter13.3 m14.7 m13 m3.0 m3.8 m3.9 m—
Drive Power60 kW60 kW67 kW34 kW62.5 kW80.5 kW (75 kW + 5.5 kW)—
Power Supply380V380V380V380V380V380V380V
05

Application Scenarios

Start with the venue and visitor experience.

06

Related Rides & Solutions

Plan complementary experiences around the centerpiece.

Explore all solutions
09

Category FAQ

How do I choose the model?

Start with the audience, plot, utilities and ride role. Compare technical values, then review the configuration with an engineer.

Can the appearance and lighting be customized?

Theme, colors and lighting can be discussed for the model. Structural or electrical changes need engineering review.

How are installation and training planned?

Review foundations, lifting access, site readiness, installation responsibilities, commissioning and operator instruction for the order.

What affects the project budget?

Include equipment, foundations, utilities, freight, installation and local acceptance requirements. Financial returns depend on your operating assumptions.

10

Tell Us About Your Project

TALK TO AN ENGINEER

Find The Right High Altitude Rides Model

Tell us your requirements and how to reach you. We include this page's topic with your message.

Step 1 of 2 · Contact & Requirements

Fields marked with * are required.

We use your details to handle your inquiry. Read our Privacy Policy for collection, storage and your choices. An inquiry does not subscribe you to marketing.

Your inquiry is submitted in step 1. Step 2 lets you send additional details.

Add Us On WeChat

Open WeChat and scan this QR code to add the DINIS contact.

Scan this QR code in WeChat to add the DINIS contact

On a phone, save the QR image and scan it from your WeChat album.

Save QR code